Washington Evening Journal
http://washington-ia.villagesoup.com/p/1228365

Neighbors Growing Together | Nov 24, 2014

Work to be done on Pleasant Plain Road

Aug 19, 2014

Weather permitting, on Thursday, Aug. 21, Pleasant Plain Road (W21) will have an asphalt leveling course placed over a reinforced concrete box culvert approximately 0.75 miles south of Hwy 1/78 to repair a dip in the pavement.

Norris Asphalt Paving Co. of Ottumwa will mill into the existing pavement and place a leveling course of hot mix asphalt over a reinforced concrete box culvert that has settled near the Washington-Jefferson County line. This work will require temporary lane closures and flaggers directing traffic through the work zone. Please use caution when traveling through the area on Thursday as work is performed to improve the road.

Questions pertaining to the project should be directed to the Washington County Engineer’s Office at (319) 653-7731.

 

Comments (0)
If you wish to comment, please login.