Washington Evening Journal
https://washington-ia.villagesoup.com/p/1049740

Fairfield Ledger   Mt. Pleasant News
Neighbors Growing Together | Nov 23, 2017

Construction scheduled

Aug 29, 2013
On Thursday, Aug. 29, Riverside Road (W61) will be closed at the bridge approximately 0.5 miles north of G36 (220th Street) for the replacement of the north bridge approach pavement.Tek Builders Inc. of Mount Ayr, will remove the existing approach and pour a new portland cement concrete approach.  This work will require a 48-hour closure of the Riverside Road at this location.  There will be a marked detour route for this closure, which will use Palm Avenue, approximately 0.75 miles east of the Riverside Road intersection with G36, to allow north- and south-bound traffic on the Riverside Road to access G36. Questions pertaining to the project should be directed to the Washington County Engineer’s office at 319-653-7731.

On Thursday, Aug. 29, Riverside Road (W61) will be closed at the bridge approximately 0.5 miles north of G36 (220th Street) for the replacement of the north bridge approach pavement.
Tek Builders Inc. of Mount Ayr, will remove the existing approach and pour a new portland cement concrete approach.  This work will require a 48-hour closure of the Riverside Road at this location.  There will be a marked detour route for this closure, which will use Palm Avenue, approximately 0.75 miles east of the Riverside Road intersection with G36, to allow north- and south-bound traffic on the Riverside Road to access G36.
Questions pertaining to the project should be directed to the Washington County Engineer’s office at 319-653-7731.

Comments (0)
If you wish to comment, please login.