Washington Evening Journal
https://washington-ia.villagesoup.com/p/1765597

Fairfield Ledger   Mt. Pleasant News
Neighbors Growing Together | Aug 21, 2018

Section of Orange Ave. closed for bridge replacement

Jul 20, 2018

A section of Orange Avenue will be closed beginning Wednesday, July 25, for a bridge replacement project.

According to a news release, Orange Ave., will be closed approximately a half-mile north of 160th St. for a bridge replacement project. The project consists of replacing the bridge over Camp Creek with a Triple 10’x12’x48’ reinforced concrete box culvert. Iowa Bridge and Culvert, L.C. of Washington, Iowa was awarded the project with a bid of $436,648.25. The project is expected to take approximately 3-4 months.

Questions about the project may be directed to the Washington County Engineer at (319) 653-7731.

Comments (0)
If you wish to comment, please login.